ARDA PROJECT– Phase No. 1

Ministry of Water & Electricity (MOWE)

Project Value SAR 76,814,574.76
Project Key Info
  1. Horizontal Drilling D=700 MM for 180 LM
  2. Installation of ductile pipe PN 25 ranged from 250 to 400 MM for 72,000 LM
  3. Installation of polyethylene pipe PN 16 ranged from 110 to 200 MM for 305,000 LM
  4. 2 units of Glassed steal water tank with capacity of 10,000 M3
  5. Total house connection of 8,100 units
  6. One unit of SCADA system
  7. Booster pump