Project Value SAR 59,252,425.00
Project Key Info
  1. Horizontal Drilling D=700 MM for 200 LM.
  2. Installation of ductile pipe PN 25 ranged from 250 to 400 MM for 32,000 LM.
  3. Installation of polyethylene pipe PN 16 ranged from 110 to 200 MM for 291,000 LM.
  4. Glassed steal water tank with capacity of 10,000 M3.
  5. Total house connection of 10,000 units.
  6. One unit of SCADA system.