Project Value SAR 13,868,590.00
Project Key Info
  1. Horizontal Drilling D=700 MM for 300 LM.
  2. Installation of ductile pipe PN 25 ranged from 150 MM for 7,300 LM.
  3. Installation of polyethylene pipe PN 16 ranged from 110 to 225 MM for 26,450 LM.
  4. Concrete water tank with capacity of 3,200 M3.
  5. Total house connection of 370 units.
  6. One unit of SCADA system.