Rona Project

Ministry of Water & Electricity (MOWE)

Rona Project

Rona Project

Project Value SAR 22,569,299.8
Project Key Info
  1. Surveying works.
  2. Excavation & backfilling works for pipeline with depths (from 2.5 to 4 m).
  3. 500 mm ductile pipe PN25 with total length 16500 LM.
  4. Valve champers with different types (shutout - washout - air release valves) total 24 chambers.
  5. Pipes protections in valleys total 350 LM.
  6. Horizontal drilling crossing highways total 100 LM.
  7. Asphalts and road works total 50000 SM.
  8. Connecting the pipeline at the feeding point and end point.
  9. Engineering works.